Skip to content
Train punctuality

Firenze Campo Marte Montecatini Terme-Monsummano

Planning a train trip from Firenze Campo Marte to Montecatini Terme-Monsummano? Here you'll find updated punctuality statistics, average delays, and arrival time distribution based on data from the last 7 days.

View reverse route: Montecatini Terme-Monsummano → Firenze Campo MarteSee today's timetable and delays on this route
High-speed train at an Italian station platform

Tickets Firenze Campo Marte → Montecatini Terme-Monsummano

Compare train ticket prices · Ad

Buy ticket
Estimated from trains passing through this route, not only those terminating at these two stations.
On time
75.0%
Average delay
-1.5 min
Maximum delay
6 min
Trains monitored
12
Delay distribution
On time
75.0%
1-5 min
16.7%
6-15 min
8.3%
16-30 min
0.0%
30+ min
0.0%

Taking your bike on this route

On Intercity trains bike spaces are reservable (~€3.50), regionals need a bike ticket, high-speed trains allow folding bikes only.

Read the bike guide

Frequently asked questions about Firenze Campo Marte - Montecatini Terme-Monsummano route

How punctual is the train from Firenze Campo Marte to Montecatini Terme-Monsummano?

Based on our data, trains from Firenze Campo Marte to Montecatini Terme-Monsummano have a punctuality rate of 75% with an average delay of -1.5 minutes.

How long does it take to go from Firenze Campo Marte to Montecatini Terme-Monsummano by train?

Travel time depends on the train type. Frecciarossa is the fastest, followed by Frecciargento and Intercity. Check specific times by searching for your train on Treniamo.

When is the best time to travel from Firenze Campo Marte to Montecatini Terme-Monsummano?

Early morning trains (6-8 AM) are generally more punctual. Avoid evening rush hours (5-7 PM) and Friday/Sunday evenings for lower delay risk.

Monitor your train

Search for your train number on the homepage to track its real-time position and receive delay updates.

Go to homepage

Popular routes

Data from unofficial sources. Statistics calculated over the last 7 days.